Skip to main content
. 2015 Feb 9;5:8328. doi: 10.1038/srep08328

Table 2. The RMS values of kinematic PPP solutions of single- , and four-system modes in north, east and up components (MGEX and BETN networks from September 1 to December 9 in 2013).

System E(cm) N(cm) U(cm)
G 1.4 1.2 4.4
R 2.9 1.8 5.9
C 1.3 1.3 5.4
G/R/E/C 0.9 0.9 3.1