Skip to main content
. 2015 Feb 19;15:25. doi: 10.1186/s12888-015-0402-4

Table 7.

Mean costs, mean QALYs accrued and mean ICECAP-O change at 12 months

IC (n = 27) GS (n = 21) GM (n = 22)
Mean cost (s.d.) £1,482.00 (£3,495.88) £1,510.59 (£3,825.71) £1,432.75 (£2,312.49)
Mean QALYs (s.d.) 0.85 (0.18) 0.87 (0.17) 0.83 (0.24)
Mean ICECAP-O change (s.d.) −0.01 (0.13) 0.03 (0.07) 0.00 (0.10)

Note: IC = control, GS: goal-setting, GM: goal-setting with mentoring.