Table 1.
% Of reshuffling | P (C value) | P (C+ value) | P (C value)/P (C+ value) |
---|---|---|---|
10 | 0.06947282 | 0.004927 | 14.09904 |
20 | 0.01698723 | 0.000201 | 84.51098 |
30 | 0.003641975 | 2.09E−06 | 1740.591 |
40 | 0.000705596 | 3.44E−08 | 20492.59 |
50 | 0.000120973 | 1.42E−11 | 8523197 |
60 | 1.75E−05 | 2.72E−14 | 6.43E+08 |
70 | 2.77E−06 | 4.31E−18 | 6.42E+11 |
80 | 7.47E−07 | 6.50E−22 | 1.15E+15 |
90 | 2.28E−07 | 1.01E−24 | 2.25E+17 |
100 | 1.45E−07 | 1.09E−25 | 1.33E+18 |
Note: P(X) is the tail probability (P-value) of “X < the dash line” (dash line denotes the current genomic arrangement) for each score distribution. The P-values are calculated based on the observations that all the score distributions follow a normal distribution by the skewness and kurtosis test [19].