Skip to main content
. 2015 Mar 12;81(7):2384–2394. doi: 10.1128/AEM.03269-14

TABLE 1.

Physicochemical parameters of the groundwater at site H4 with two wells and further downstream at site H5a

Site and date Mean conductivity (μS cm−1) ± SD Mean pH ± SD Mean oxygen saturation (%) ± SD Mean dissolved CO2 concn (mmol liter−1) ± SD Mean bicarbonate concn (mmol liter−1) ± SD Mean TOC concn (μmol liter−1) ± SD Mean NO3 concn (μmol liter−1) ± SD Mean NH4+ concn (μmol liter−1) ± SD Mean SO42− concn (mmol liter−1) ± SD
H4-3
    24-mo study period 747 ± 27 7.2 ± 0.1 5.3 ± 9.9 0.46 ± 0.17 6.74 ± 0.63 94.9 ± 9.2 6.0 ± 6.8 7.8 ± 3.0 0.37 ± 0.1
    Nov 2010 645 7.3 1.0 ND ND 112.4 BD 10.8 0.39
    Apr 2011 754 7.2 3.5 0.45 7.55 83.3 BD 5.5 0.41
H4-1
    24-mo study period 748 ± 50 7.3 ± 0.1 38.3 ± 15.0 0.39 ± 0.18 6.33 ± 0.79 74.1 ± 10.8 121.2 ± 51.7 9.0 ± 6.7 0.79 ± 0.32
    Nov 2010 656 7.4 39.6 ND ND 68.3 142.6 11.4 0.76
    Apr 2011 776 7.3 62.8 0.39 5.81 81.6 160.0 BD 1.09
H5-1
    24-mo study period 1013 ± 72 7.1 ± 0.1 37.1 ± 9.1 0.44 ± 0.18 5.43 ± 0.56 79.1 ± 10.0 137.3 ± 22.2 4.6 ± 4.5 2.53 ± 0.34
    Nov 2010 842 7.2 40.7 ND ND 87.4 186.8 2.9 2.09
    Apr 2011 1051 7.2 36.8 0.44 5.47 94.9 131.0 BD 2.64
a

Data are from site H4 with two wells (wells H4-3 [12-m depth] and H4-1 [48-m depth]) and further downstream at site H5 (well H5-1 [88-m depth]). Data are means ± standard deviations of results obtained during a 24-month study period. For each site, values are also given for the months when samples were taken for diversity analysis. Well H4-3 was in the upper cycloides bank aquifer, whereas wells H4-1 and H5-1 were located in the lower trochite limestone aquifer. Detection limits for NO3 and NH4+ were 1 μmol liter−1 and 0.5 μmol liter−1, respectively. ND, not determined; BD, below the limit of detection.