Skip to main content
. 2015 Mar;15(1):188–196. doi: 10.4314/ahs.v15i1.25

Table 1.

Summary of the pass/fail criteria of the tools

RTHB PEDS PEDS (Path A
and B as fail)
PEDS:DM PEDS tools
Pass 0 unmet
milestones
Path E Path C,D and
E
0 unmet
milestones
Path B-E if 0
unmet
milestones on
the PEDS:DM
Fail ≥1 unmet
milestone
Path A–D Path A and B ≥1 unmet
milestone
Path A or
Path B–E if ≥1
unmet
milestone on
the PEDS:DM