Skip to main content
. 2014 Jun 11;74(6):2901. doi: 10.1140/epjc/s10052-014-2901-8

Table 4.

The unfolded β distributions and their uncertainties for the central region |η2|0.8. All uncertainties are symmetric and given in percent (%)

β (degree) Fη2(β) σStat σJES σJER σJAR σPM σSyst
0–10 0.0549 3.5 1.0 0.3 0.4 0.6 1.3
10–20 0.0535 3.9 1.1 0.4 0.6 0.6 1.4
20–30 0.0544 4.2 0.5 0.5 0.3 0.6 1.0
30–40 0.0538 4.0 1.1 0.2 0.3 0.6 1.3
40–50 0.0525 3.8 0.5 0.5 0.5 0.6 1.1
50–60 0.0515 4.4 0.6 0.6 0.7 0.6 1.3
60–70 0.0515 4.3 0.6 0.4 0.6 0.6 1.1
70–80 0.0519 4.1 0.5 0.3 0.4 0.6 0.9
80–90 0.0511 4.2 0.4 0.4 0.5 0.6 1.0
90–100 0.0515 4.3 0.5 0.3 0.2 0.6 0.9
100–110 0.0528 4.3 0.5 0.4 0.5 0.6 1.0
110–120 0.0543 4.3 0.6 0.6 0.3 0.6 1.1
120–130 0.0580 4.1 1.2 0.5 0.4 0.6 1.5
130–140 0.0583 3.7 0.5 0.6 0.3 0.6 1.0
140–150 0.0616 4.2 0.6 0.5 0.5 0.6 1.1
150–160 0.0622 3.9 0.9 0.6 0.5 0.6 1.3
160–170 0.0626 3.6 0.7 0.5 0.6 0.6 1.2
170–180 0.0638 3.2 0.5 0.7 0.6 0.6 1.2