Skip to main content
. 2015 Mar 31;6:250. doi: 10.3389/fmicb.2015.00250

FIGURE 2.

FIGURE 2

Toolik inlet stream during summer 2004 from June 8 to August 27. (A) Temperature (thin line) and stream discharge (thick line); (B) DOC (Inline graphic); (C) NH4 (Inline graphic), PO4 (Inline graphic), and NO3 (Inline graphic); (D) BP at Toolik inlet (Inline graphic) and outlet (Inline graphic).