Econometrics implications of electric-power generation from modeled wind at study sites.

Hub height
h (m)
Katsina Warri Calabar
PVC
(€)
Annual power output
P e,ave/yr
(kWh)
Total power output
P e,ave × t
(kWh)
PVC
()
Annual power output
P e,ave/yr
(kWh)
Total power output
P e,ave × t
(kWh)
PVC
(€)
Annual power output
P e,ave/yr
(kWh)
Total power output
P e,ave × t
(kWh)
10 5,500.02 4,744.68 94,893.60 5,500.02 1,282.58 25,651.52 5,500.02 801.91 16,038.21
30 5,702.44 5,612.30 112,246.01 5,702.44 1,933.54 38,670.87 5,702.44 1,375.33 27,506.69
50 5,904.86 5,828.98 116,579.70 5,904.86 2,534.15 50,682.99 5,904.86 1,968.56 39,371.29
70 6,107.27 5,791.70 115,833.97 6,107.27 3,119.44 62,388.83 6,107.27 2,609.11 52,182.23
90 6,309.69 5,631.27 112,625.44 6,309.69 3,682.58 73,651.69 6,309.69 3,286.77 65,735.31
110 6,512.10 5,408.99 108,179.77 6,512.10 4,208.84 84,176.73 6,512.10 3,974.56 79,491.15