Skip to main content
. 2004 Jun 15;101(25):9291–9296. doi: 10.1073/pnas.0306842101

Table 1. Net precipitation to the Neuse watershed and discharge (mass water transport at Mills Branch), number of fill volumes, and estimated nutrient load to the NRE study area.

Event Period, days Net precipitation delivery, 109 m3 Discharge (Mills Branch), 109 m3 Fill volumes to estuary TN loading, 106 kg TP loading, 106 kg
Fran 36 3.47 25% 1.78 25% 4.7 20% 2.75 32% 0.50 55%
Floyd 36 6.05 44% 2.72 39% 7.2 31% 2.35 28% 0.48 53%
Fran 75 3.51 26% 2.66 38% 7.0 30% 3.73 44% 0.58 64%
Floyd 75 6.58 48% 3.90 56% 10.3 45% 3.64 43% 0.65 71%

Data are from the 36- and 75- day (September 6 to October 11 and September 6 to November 19, respectively) posthurricane periods in 1996 (Fran) and 1999 (Dennis, Floyd, and Irene). The second number in each column represents the percentage of the mean annual (1993—2002) for the variable indicated.