Table 4.
Validity of the measurement model
| Scales | CR | AVE | MSV | ASV | BI | ACT | PGI | PQ | SN | PR |
|---|---|---|---|---|---|---|---|---|---|---|
| BI | 0.936 | 0.786 | 0.468 | 0.270 | 0.886 | |||||
| ACT | 0.909 | 0.668 | 0.468 | 0.292 | 0.684 | 0.818 | ||||
| PGI | 0.883 | 0.604 | 0.364 | 0.179 | 0.441 | 0.449 | 0.777 | |||
| PQ | 0.886 | 0.722 | 0.004 | 0.001 | −0.023 | −0.002 | 0.043 | 0.850 | ||
| SN | 0.915 | 0.843 | 0.383 | 0.200 | 0.495 | 0.619 | 0.364 | −0.062 | 0.918 | |
| PR | 0.774 | 0.537 | 0.441 | 0.289 | 0.664 | 0.640 | 0.603 | 0.007 | 0.483 | 0.733 |
Notes: CR-Composite Reliability; AVE-Average Variance Extracted; Variance; ASV-Average Shared Variance; Square root of AVE (diagonal elements) and correlation between latent variables (off-diagonal elements); Risk Averseness was dropped from the model due to validity issues.