Table 6.
Variable | Ratio of median cost (LDP/ODP) | % change in median cost (LDP/ODP) | P value |
---|---|---|---|
Operating room minutes | 0.84 | −13.5 % | 0.065 |
Total direct cost | 0.80 | −20.0 % | 0.179 |
Operating room (OR) cost: | 1.12 | 10.5 % | 0.091 |
OR team | 0.81 | −20.0 % | 0.027 |
Supplies | 1.93 | 91.7 % | <0.001 |
Recovery room | 0.83 | −17.2 % | 0.466 |
Blood cost | 0.75 | −24.4 % | 0.020 |
Nursing cost | 0.75 | −25.6 % | 0.048 |
Pharmacy cost | 0.85 | −15.3 % | 0.154 |
Laboratory cost | 0.61 | −38.4 % | 0.002 |
Radiology cost | 0.52 | −46.2 % | 0.526 |
Other cost | 0.97 | −0.65 % | 0.317 |