Skip to main content
. 2015 Apr 17;16(Suppl 6):S5. doi: 10.1186/1471-2105-16-S6-S5

Figure 5.

Figure 5

Performance of the Slowly Changing Graphical model. The slowly changing graphical model misses some of the timings of the changes, but correctly identifies the regime change and it recovers the underlying structure of the changing network.