Skip to main content
. 2015 Apr 23;16(Suppl 7):S8. doi: 10.1186/1471-2105-16-S7-S8

Table 2.

Intra- and inter-operator variation analysis for manual ICV estimation

Op1 (Phase I) Op2 (Phase I) Op1 (Phase II) Δop11 Δop12 MRPA1 MRPA1
AD 1.4870 ± 0.16418* 1.4870 ± 0.16416 1.4870 ± 0.16418 p = 0.55 p = 0.23 0.002 0.004
AC 1.4609 ± 0.14444 1.4610 ± 0.14436 1.4609 ± 0.14446 p = 0.35 p = 0.33 0.002 0.014

*ICV (mm3) presented as mean ± standard deviation (a factor of 106 has been taken from all values). Op1 (Phase I): ICV measurements performed by Op1 in phase I of the study; Op2 (Phase I): ICV measurements performed by Op2 in phase I of the study; Op1 (Phase II): ICV measurements performed by Op1 in phase II of the study; Δop11 is the result for testing the null hypothesis that the ICV measurements performed by Op1 (Phase I) is not significantly different from ICV measurements performed by Op1 (Phase II). Δop12 is the result for testing the null hypothesis that ICV measurement calculated manually by Op1 (Phase I) is not significantly different from ICV measurements done by Op2 (Phase II). Paired t-test is used. MRPAD1: Mean related percentage of absolute difference between ICV measurements performed by Op1 in Phase I and Phase II which provides intra-operator error in manual ICV estimation. MRPAD2: Mean related percentage of absolute difference between ICV measurements performed by Op1 and Op2 in Phase I which is related to inter-operator error; AD: Adult With Alzheimer's Disease subject group; AC: Adult Control subject group.