Skip to main content
. 2015 May 12;10(5):e0127223. doi: 10.1371/journal.pone.0127223

Fig 3. Interactions between CFIR domains and constructs.

Fig 3

Implementation occurred at two nodes. The term “node” is used to describe the crucial intersection of CFIR domains to describe how implementation happens. Node 1 predicts the adoption of the electronic register for roll-out while Node 2 describes implementation at facility-level. Although all five domains come into play at each node, the figure shows the most important domains and constructs highlighted in our findings.