Skip to main content
. 2015 Apr 14;15(4):8664–8684. doi: 10.3390/s150408664

Figure 9.

Figure 9

(a) The circle tunnel; (b) the half-circle tunnel; (c) the dedicated vehicle installed with the MSVS and VCC; (d) the manual static measurement.