Skip to main content
. 2015 Apr 30;27(4):1141–1144. doi: 10.1589/jpts.27.1141

Table 2. ICC3,1 and 95% CI for inter-examiner reliability of day 1.

ICC (95%CI)
Goniometer 0.25 (−0.68 to 0.67)
Goniometer with a laser beam 0.62 (0.13 to 0.83)
Inclinometer 0.27 (−0.64 to 0.68)