Skip to main content
. 2015 Mar 2;15(3):5151–5162. doi: 10.3390/s150305151

Figure 1.

Figure 1

The layout of the receiving position. Zone I: the air zone inside the pipe; Zone II: the wall of the pipe; Zone III: the air zone from the outside surface of the pipe to the bias coil.