Skip to main content
. 2014 Oct 6;112(20):6277–6282. doi: 10.1073/pnas.1312753111

Table 1.

Cumulative material requirements for electricity production for the BLUE Map scenario

Material Annual production (2011), Gt Metal requirements to 2050, Gt Ratio
Aluminum 0.045 0.067 1.5
Copper 0.013 0.029 2.2
Iron 1.5 1.3 0.87
Cement 3.4 0.52 0.15

The middle column provides an estimate of the volumes of materials that need to be produced to provide for the capital stock additions between 2010 and 2050 and the material requirements associated with operational inputs (fuels, transport, solvents, etc.) during the same period. The right hand column expresses these material requirements as a fraction of the 2011 production volume.