Table 4.
Computing times (T) in seconds (including computation of standard errors) and estimated standard errors of QL parameter estimates for different combinations of grid size and tapering
| Acalypha | Lonchocarpus | Capparis | |||||
|---|---|---|---|---|---|---|---|
| Grid | ∊ | T | sd. | T | sd. | T | sd. |
| 100×50 | 0.05 | 12.1 | 0.085 1.2 | 22.4 | 0.088 0.69 0.055 | 13.0 | 0.067 0.86 1.1 1.0 |
| 0.01 | 12.0 | 0.085 1.2 | 24.0 | 0.088 0.69 0.055 | 13.5 | 0.067 0.86 1.1 1.0 | |
| .002 | 12.1 | 0.085 1.2 | 25.9 | 0.088 0.69 0.055 | 13.6 | 0.067 0.86 1.1 1.0 | |
|
| |||||||
| 150×75 | 0.05 | 59.4 | 0.079 1.1 | 187.2 | 0.087 0.69 0.055 | 158.6 | 0.066 0.86 1.1 1.0 |
| 0.01 | 58.9 | 0.079 1.1 | 204.6 | 0.087 0.69 0.055 | 169.5 | 0.066 0.86 1.1 1.0 | |
| .002 | 63.6 | 0.079 1.1 | 226.5 | 0.087 0.69 0.055 | 170.7 | 0.066 0.86 1.1 1.0 | |