Table 3.
Slump measurements.
| Water/ cement ratio |
Slump (in) |
Slump (mm) |
|
|---|---|---|---|
| Control-0% TDA | 0.55 | 0.5 | 12.7 |
| 7.5% TDA-2′′-SF-A | 0.55 | 0.25 | 6.4 |
| 7.5% TDA-1′′-NaOH | 0.55 | 1.5 | 38.1 |
| Control-0% TDA | 0.60 | 2.25 | 57.2 |
| 7.5% TDA-1′′ | 0.60 | 3.5 | 88.9 |
| 7.5% TDA-1′′-SF-A | 0.60 | 2 | 50.8 |