Skip to main content
. 2014 May 15;13:536–547.

Figure 2. Time spent in the four water maze quadrants over four probe trials occurred on day 5, the first week (R1W), and the second week (R2W) after the last training session. PF indicates the quadrant that contained the escape platform. Q1, Q2, and Q3 indicate the other quadrants of the maze.

Figure 2