Table 5.
Variable | Category | Hazard ratio (95% CI) | p-value |
---|---|---|---|
Time with catheter | ≤5 days | 1 | 0.007 |
>5 days | 4.12 (1.47–11.6) | ||
Lasing energy | – | 1.18* (0.80–1.74) | 0.40 |
CI = confidence interval
Hazard ratio for a 50,000J increase in energy
Variable | Category | Hazard ratio (95% CI) | p-value |
---|---|---|---|
Time with catheter | ≤5 days | 1 | 0.007 |
>5 days | 4.12 (1.47–11.6) | ||
Lasing energy | – | 1.18* (0.80–1.74) | 0.40 |
CI = confidence interval
Hazard ratio for a 50,000J increase in energy