Skip to main content
. 2015 Jun 26;10(6):e0130798. doi: 10.1371/journal.pone.0130798

Table 2. Statistical analysis results of the modeling parameter estimation derived from the linear regression model in (4).

Independent variable Coefficient p value
FPM_VL 4.62 + 5.90 0.079
FPM_GAS 4.05 + 3.19 0.031
C 0 (intercept) 13.37 + 0.85 0.039