Skip to main content
. 2015 Jul 9;6:954. doi: 10.3389/fpsyg.2015.00954

FIGURE 3.

FIGURE 3

Grand average ERPs of late positive potential (LPP) components for negative (purple lines), neutral (red lines), and positive (black lines) conditions recorded at Cz, CPz, Pz.