Skip to main content
. 2015 Jul 13;15(7):16956–16980. doi: 10.3390/s150716956

Figure 8.

Figure 8

Estimated OHS levels in the afternoon: (a) OHS for Worker 4; (b) OHS for Worker 6; and (c) OHS for Worker 7.