Skip to main content
. 2015 Aug 21;10(8):e0135171. doi: 10.1371/journal.pone.0135171

Fig 1. Distribution of weights for Swiss (dark lines. n = 9) and Quebec (dotted lines. n = 8) stakeholders for the 12 original criteria.

Fig 1

Legend: PHC1 Reduction in incidence of human cases; PHC2 Reduction in entomological risk; PHC3 Impacts of adverse health effects; AEC1 Impact on habitat; AEC2 Impact on wildlife; SIC1 Level of public acceptance; SIC2 Proportion of population benefitting from intervention; SEC1 Cost to the public sector; SEC2 Cost to the private sector; SEC3 Delay before results; SEC4 Complexity; SEC5 Impact on organisation’s credibility.