(d) CPSO first iteration
| Search variable | Tasks | ET | Cost | ||||
|---|---|---|---|---|---|---|---|
| A | B | C | D | E | |||
| x 1 1 | 0.7 | 0.6 | 0.1 | 0.4 | 0.2 | 14.6 | 3.9 |
| v 1 1 | 0.1 | 0 | 0 | 0.2 | 0 | ||
| Plan1 1 | 3 | 2 | 1 | 2 | 1 | ||
|
| |||||||
| x 2 1 | 0.8 | 0.6 | 0.3 | 0.4 | 0.1 | ||
| v 2 1 | −0.1 | 0 | −0.2 | 0.2 | 0 | 14.6 | 3.9 |
| Plan2 1 | 3 | 2 | 1 | 2 | 1 | ||
|
| |||||||
| x 3 1 | 0.7 | 0.4 | 0.6 | 0.4 | 0.7 | ||
| v 3 1 | 0.2 | 0 | −0.4 | 0.2 | −0.6 | 16.7 | 4.3 |
| Plan3 1 | 3 | 2 | 2 | 2 | 3 | ||
|
| |||||||
| Best1 | 3 | 2 | 1 | 2 | 1 | 14.6 | 3.9 |