Skip to main content
. 2015 Sep 11;9(5):054106. doi: 10.1063/1.4930865

FIG. 5.

FIG. 5.

RBC clogging and breakage procedure. (a) The RBCs clog the entrance of the filtration area. (b) Opening of the entrance of the filtration area using reverse EO flow. (c) The entrance is opened after 5 s. (Multimedia view) [URL: http://dx.doi.org/10.1063/1.4930865.2]Download video file (3.2MB, mp4) DOI: 10.1063/1.4930865.2