Skip to main content
. 2015 Sep 16;5:14312. doi: 10.1038/srep14312

Figure 5. Adaptation pathways and yield change from the current level in the non-forecast case, 10-yr-forecast case, and 20-yr-forecast case in India (IND) under the RCP8.5 scenario of the MIROC-ESM projection.

Figure 5

The pathways and yield change in the timely case are also shown.