Skip to main content
. 2015 Oct 7;10(10):e0137112. doi: 10.1371/journal.pone.0137112

Fig 3. Running means percentile analysis for turbidity (NT U) at sites close to dredging (<2 km) or at reference sites during the Barrow Island, Cape Lambert and Burrup Peninsula dredging projects (see Fig 1).

Fig 3

The 100th (maximum), 99th and 95th and 80th percentiles for the running mean turbidity are shown. Percentiles were calculated separately for the baseline period (dashed grey lines) and during dredging (black solid lines).