Skip to main content
. 2015 Oct 7;10(10):e0137112. doi: 10.1371/journal.pone.0137112

Fig 4. Turbidity (NTU) percentile values for running means calculated on time scales of one hour (h) and 1, 14 and 30 days (d) for all sites at (A) Barrow Island, (B) Cape Lambert and (C) Burrup Peninsula dredging projects.

Fig 4

White symbols represent percentiles for the baseline period (pre-dredging period), grey symbols represent reference sites during the dredging period and black symbols represent sites close to (<2 km) the dredging.