Skip to main content
. 2015 Oct 19;9:276. doi: 10.3389/fnbeh.2015.00276

Figure 1.

Figure 1

Performance of C57BL/6J in the Multiple-T maze task: (A) Measured parameters include Path length (B), Latency (C), Speed (D), and Correct decisions (E). Latency and path length decreased, while speed and correct decision increased across the training days. n = 10; Data are expressed as mean ± SD and were analyzed by ANOVA repeated measures; ***p < 0.001.