Skip to main content
. 2015 Oct 15;14:79. doi: 10.1186/s40200-015-0211-9

Table 4.

Levine F test for homogeneity of variance in three research groups

Variables Tower of London errors Tower of London copies Tower of London run-time Tower of London Total score Planning, organizing the second round Planning, organizing the first stage
Index
df1a 2 2 2 2 2 2
df2 117 117 117 117 117 117
F 0.77 2/.1 0.35 0/18 0.02 0.05
sig 0.46 0.06 0.70 0.83 0.94 0.91

aDgree of Freedom