Table V.
Using incident counts for the UKPDS |
Using the UKPDS risk equation |
||||
---|---|---|---|---|---|
Mockup probability values |
Absolute Error |
Relative Error |
Absolute Error |
Relative Error |
|
01 | 0.005 | −8.8E–12 | −1.8E–09 | −1.2E–11 | −2.5E–09 |
02 | 0.03 | 1.85E–11 | 6.16E–10 | −3.8E–11 | −1.3E–09 |
12 | 0.05 | 4.29E–10 | 8.58E–09 | 2.3E–10 | 4.6E–09 |
14 | 0.05 | 3.48E–09 | 6.96E–08 | 1.08E–09 | 2.16E–08 |
23 | 0.8 | 8.32E–09 | 1.04E–08 | −3.3E–09 | −4.2E–09 |
32 | 0.1 | −3.1E–10 | −3.1E–09 | −2.2E–09 | −2.2E–08 |
34 | 0.08 | 2.3E–09 | 2.88E–08 | −1.1E–10 | −1.4E–09 |
The first two columns represent the model input probabilities which are also the expected estimation results. The following columns show the accuracy of the estimation engine from these expected results for both models.