Skip to main content
. 2015 Oct 29;3:e1360. doi: 10.7717/peerj.1360

Table 3. DEG set size and expected PPV of the DEG call methods in the analysis of Rajkumar data set.

Variation in DEG set size and expected PPV were computed using bootstrapping for methods where the DEG set size was not too small or too large.

Method DEG set size ± SE PPV ± SE (%)
voom 287 ± 43 88.9 ± 4.1
edgeR 564 ± 694 72.6 ± 15.0
DESeq 3,384 NR
Z-test 9,417 NR
DESeq2 10 NR
NOISeq 31 NR
GFOLD 38 NR

Notes.

SE
standard error
NR
Not Relevant