Skip to main content
. 2015 Nov 16;10(11):e0142444. doi: 10.1371/journal.pone.0142444

Fig 8. Stimuli (top) and absolute error (bottom) of estimates of Pr(B > A, B > C).

Fig 8

Error bars in the results plot indicate a 95% confidence interval. An animated version of this figure is available in the animated manuscript (S1 File).