Table 1. Summary of results from two deployments of the WISSARD GT at SLW.
GT-1 | GT-2 | Uncertainty | |
Date, time (local) |
31 Jan 2013, 1035 |
31 Jan 2013, 1600 |
— |
TBW (°C) | −0.555 | −0.556 | ±0.01 |
TS1 (°C) | 0.387 | −0.390 | ±0.01 |
zS1 (m) | 0.81 | 0.78 | ±0.08 |
ΔT/Δz (°C/m) | 0.207 | 0.213 | +0.04, −0.07 |
λ (W/m K) | 1.36 | 1.36 | ±0.12 |
q (mW/m2) | 280 | 290 | 80 |