Skip to main content
. 2015 Jul 9;5:11446. doi: 10.1038/srep11446

Figure 5.

Figure 5

Relationship between the PWF of hydroelectric power (PWFh) and the flooded area per unit of installed hydroelectric capacity (α) for (A) plants with power generation as the primary purpose; (B) plants with power generation as the secondary purpose; (C) all plants; and (D) hydroelectric power plants with an installed hydroelectric capacity greater than 500 MW.