Number of scans/slide |
• heavy use scanned 6x/day: Slides A2, B2, B3, C2 |
• standard use scanned 6x/week: Slides A1, A3, B1, C1, C3 |
• minimal use scanned 6x/study: Slides A4, B4, C4 |
Recovery time |
• five minutes |
• several hours to two days |
Time between slide production and use |
• Lots A and B: slides used within three months of printing; within warranty period |
• Lot C: slides printed nine months before use; warranty expired |
Slide storage conditions |
• in desiccator: Slides A1, A2, A4, B1, B2, B4, C1, C2, C4 |
• under ambient conditions: Slides A3, B3, B4, C3 |
Scanners |
• Scanner R used five days/week |
• Scanner S used one day/week |