Figure 3.
The jerk cost criteria (Jc). (a) & (b) a sample SC and DLOP pattern recovery phase absolute jerk curve depicting the area under curve as shaded regions respectively. The scheme used for computing Jc is shown below the figures. Cm : the propulsion cycle located closest to the mid of the trial (i.e. 90 seconds from the start of trial).
