Skip to main content
. 2015 Nov 27;5:262. doi: 10.3389/fonc.2015.00262

Figure 2.

Figure 2

Layout of the FNT facility at the new research reactor (FRM II): 1 Reactor core, 2 Neutron converter, 3 Neutron beam line, 4 Reactor pool wall, 5 Filter unit, 6 Multi leaf collimator, 7 Treatment table, 8 Beam stopper.