Skip to main content
. 2015 Nov 1;9(11):ZC44–ZC47. doi: 10.7860/JCDR/2015/14455.6804

[Table/Fig-3]:

Scoring criteria for evaluation of Irrigant Penatration

Scoring criteria Working length Lateral canals
Present If penetration till working length If penetration >50%
Absent No penetration If penetration < 50%