Skip to main content
. 2015 Feb 2;2(1):9–17. doi: 10.1530/ERP-15-0002

Table 2.

Analysis scores for ICE vs TTE

ICE TTE P
Work view (n=20)
 MV and SAM 1.88 (±0.28) 1.60 (±0.45) 0.02
 Target septum 1.28 (±0.64) 1.08 (±0.39) 0.30
 Other structures 0.63 (±0.39) 1.03 (±0.19) 0.002
All views (n=20)
 MV and SAM 1.93 (±0.18) 1.63 (±0.39) 0.007
 Target septum 1.35 (±0.49) 1.10 (±0.21) 0.06
 Other structures 0.85 (±0.43) 1.08 (±0.24) 0.13