Table 3.
Design constraints |
CRT |
CRT-BA |
SW-CRT |
||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
M | ρ | t | DECRT | N | k | DEBA | N | k | DESW | N | k |
30 | 0.01 | 2 | 1.29 | 1,017 | 34 | 2.24 | 1,766 | 59 | 3.22 | 2,538 | 85 |
30 | 0.25 | 2 | 8.25 | 6,501 | 217 | 2.75 | 2,167 | 73 | 3.23 | 2,544 | 85 |
100 | 0.01 | 9 | 1.99 | 1,569 | 16 | 2.64 | 2,084 | 21 | 2.16 | 1,702 | 18 |
100 | 0.25 | 9 | 25.75 | 20,291 | 203 | 2.92 | 2,298 | 23 | 2.25 | 1,772 | 18 |
Abbreviations: ICC, intracluster correlation coefficient; t, number of steps in the stepped wedge design; CRT, cluster randomized trial; CRT-BA, cluster randomized trial with before and after observations; SW-CRT, stepped wedge cluster randomized trial.
Example relates to a trial requiring 788 observations under individual randomization. Note that, N and k are rounded up to the nearest integer.