Skip to main content
. 2015 Dec 29;4:58. doi: 10.1186/s13756-015-0099-7

Table 5.

STEP 3: Match the planned Construction activity type (A,B,C,D) with the Patient Risk Group (low, medium, high, highest) to determine the Class of Precautions (1, 11, 111,1 V) or level of infection control activities required. RISK CLASS DETERMINATION

PATIENT RISK GROUPS CONSTRUCTION ACTIVITY CONSTRUCTION ACTIVITY CONSTRUCTION ACTIVITY CONSTRUCTION ACTIVITY
TYPE A TYPE B TYPE C TYPE D
Low Risk 1 11 11 111/ 1 V
Medium Risk 1 11 111 or 11 1 V
High Risk 1 11 or III 111/ 1 V 1 V
Highest Risk 11 or I-III 111/ 1 V 111/ 1 V 1 V

Description of Required Infection Control Precautions by class: Refer Appendix A3.1 and 3.2