Skip to main content
. 2015 Nov 17;44(Database issue):D595–D603. doi: 10.1093/nar/gkv1195

Figure 5.

Figure 5.

Analysis summary files at the project level are available to download in TSV format. In this example, pCDS matching InterPro entries (rows) for all runs in a project (columns) are provided.