Skip to main content
. 2015 Dec;7(12):2274–2287. doi: 10.3978/j.issn.2072-1439.2015.12.56

Figure 4.

Figure 4

Forest plot of SMD and its 95% CI of length of postoperative drainage between uniportal and three-port VATS groups. SMD, standardized mean differences; CI, confidence interval; VATS, video-assisted thoracoscopic surgery.