Tab. III.

Average values of the various parameters considered and percentage change after implementation of the quality improvement scheme.

A B C
Total microbial contamination — air (CFU/m3)
operating room - median (Q1-Q3)§ 15 (10-20) 3 (0-5) -80
air-conditioning plant < 1 < 1
Total microbial contamination — surfaces (CFU/plate)
operating room - median (Q1-Q3) § 2 (2-4) 0 (0-1) -100
Staphylococcus aureus surface (n.) 3 0 -100
MRSA contamination — surface (n.) 1 0 -100
Pyrexia above 37.5°C § 91.26% 62.14% -31.91
duration of pyrexia (days) above 37.5°C (mean+S.D)§ 6.84±3.15 3.16±1.05 -48.54
addditional antibiotic therapy§ 32.98% 17.19% -47.88
days of hospitalization (mean + SD)§ 7.99 ± 3.24 4.92 ± 0.96 -28.57
Greater revenue(Euro) due to more operations € 1,441,373.58

Legend A = case (before environment improvement); B = control (after environment improvement); C = percentage variation

§