Skip to main content
. 2016 Jan 19;5:44. doi: 10.1186/s40064-016-1686-7

Table 3.

The calculation results in different stations

Group no. N (p/min) L 1 (m) B 1 (m) v 1 (m/s) p 1 (p/m s) L 2 (m) B 2 (m) v 2 (m/s) p 2 (p/m s)
1 6 2.80 11.50 1.73 0.01 88.50 4.50 1.29 0.02
2 9 3.20 9.00 1.26 0.02 123.00 3.50 1.26 0.04
3 15 2.60 10.50 1.40 0.02 142.50 4.50 1.21 0.06
4 29 3.50 8.50 1.53 0.06 105.50 4.50 1.14 0.11
5 33 3.30 8.00 1.45 0.07 152.50 4.50 1.12 0.12
6 34 4.20 6.50 1.48 0.09 115.50 4.50 1.10 0.13
7 43 4.00 6.00 1.34 0.12 133.00 3.50 1.07 0.20
8 64 3.50 6.00 1.24 0.18 97.00 4.50 1.03 0.24
9 82 3.50 6.00 1.76 0.23 97.00 4.50 0.94 0.30
10 96 4.20 6.50 1.23 0.25 115.50 4.50 0.96 0.36
11 105 2.60 10.50 1.43 0.17 142.50 4.50 0.94 0.39
12 110 4.00 6.00 1.19 0.31 133.00 3.50 0.89 0.52
13 122 3.20 9.00 1.41 0.23 123.00 3.50 0.91 0.58
14 143 3.30 8.00 1.24 0.30 152.50 4.50 0.83 0.53
15 151 2.80 11.50 1.39 0.22 88.50 4.50 0.81 0.56
16 158 3.50 8.50 1.29 0.31 105.50 4.50 0.80 0.59
Group no. L 3 (m) B 3 (m) v 3 (m/s) p 3 (p/m s) T (s) T tr (s) Error rate (%)
1 24.00 1.20 0.50 0.08 190.76 191 0.13
2 28.00 1.10 0.50 0.14 334.73 343 2.41
3 25.00 1.20 0.50 0.21 307.56 307 0.18
4 25.00 1.10 0.60 0.44 228.10 231 1.26
5 25.00 1.20 0.60 0.46 316.25 333 5.03
6 25.00 1.10 0.50 0.52 249.65 241 3.59
7 28.00 1.10 0.60 0.65 348.78 339 2.88
8 24.00 1.20 0.50 0.89 214.93 224 4.05
9 24.00 1.20 0.49 1.14 223.37 236 5.35
10 25.00 1.10 0.46 1.45 270.50 255 6.08
11 25.00 1.20 0.41 1.46 351.75 359 2.02
12 28.00 1.10 0.38 1.67 397.62 408 2.54
13 28.00 1.10 0.38 1.85 386.48 388 0.39
14 25.00 1.20 0.31 1.99 402.03 442 9.04
15 24.00 1.20 0.28 2.10 270.76 256 5.77
16 25.00 1.10 0.27 2.39 317.34 335 5.27

T tr true time measured by the survey