Skip to main content
. 2015 Dec 28;113(2):E201–E208. doi: 10.1073/pnas.1518572113

Fig. S4.

Fig. S4.

The distribution of time required to complete HIV-1 assembly. A summary from 50 HIV-1 particles is shown. The time required to complete HIV-1 assembly is measured from the first detection of the CeFP signal to the point when the intensity of the CeFP signal reaches a plateau.